Shipyard, September 2014

Photos by Captain John

(Scroll down for more photos.)



Our first week at the shipyard.  The ferry is on the railway being prepped for painting.

September 16, 2014





























September 19, 2014



























































September 22, 2014



Cabin heat plumbing being repaired (right). Blue material is covering freshly painted cabin floor.






Pipe fitter working on cabin heat plumbing.






Rotten plywood removed from engine room floor being replaced with grating.






Full deck view.






Worker scaling rust in preparation for painting.






New hatch ring installed.






Deck hatch to engine room.




September 23, 2014



Worker installing new gaskets in leaky wheelhouse window.






Worker installing new gaskets in leaky wheelhouse window.






Taping the waterline between bottom anti-fouling paint area and lower side of boat painted black.






Installing new rudder bearing.






Side view of Charlie Wells on railways with black area above waterline painted.






Rudder installed.

(Back to top)